Skip to content
In beta

How a mission works

Getting an experiment into space is six different jobs, not one purchase.

Six jobs, usually done by six different kinds of company, in a fixed order. Most are invisible from the outside, and approaching them in the wrong order costs weeks. This page explains each one in plain English: what it is, who does it, roughly how long it takes, and who to speak to first.

Microgravity just means weightlessness. Nothing on Earth can hold it for more than a few seconds, so an experiment that needs it has to leave the ground — and these six jobs are what that takes.

Two ways through

Specialist providers

You hire a company per stage and own every handover. Drawn as six separate contract blocks, one for each of the six stages.

Managed service

One partner covers most of the chain. You sign once. Drawn as one bar covering stages 4 to 6 of 6, in place of 3 separate contracts.

Every service in the catalogue is labelled with the stages it covers, so you can see which route a company offers before you contact them.

Each stage in plain English

  1. Your experiment becomes flight hardware: a sealed, shake-proof version of your lab setup that runs itself and survives a rocket launch. If your work needs feeding, cooling or imaging while it is up there, this is the stage that builds it in.

    Who does it. Payload developers and flight-hardware houses.

    How long. About six months to design, build and test.

    Start here

    A payload developer is the right first call for most people. They will tell you what is realistic, what it takes to make your experiment flight-safe, and which platforms suit it.

    See payload developers

What the money is spent on

A mission is a capital project, not a purchase off a shelf. There is no single price for one, because the total is the sum of these lines — and which of them you pay for depends entirely on the route you take.

  • Building the flight hardware
  • Modifying hardware that already exists
  • The launch itself
  • Astronaut time, if a crew has to handle it
  • Facility fees on the platform
  • The return capsule, if samples come back
  • Renting lab space at the launch site
  • The safety and qualification work

Grant coverage varies enormously, and a small grant will not reach space. Some calls pay for the launch and the hardware; others pay only for your own staff time. Check what a call covers before you count on it.

Where a provider publishes a price for a specific service, it is on that service’s page in their own currency, exactly as they published it.

Nothing here is bookable

This is not a flight-booking site. Providers do not hold slots waiting for customers, and there is no availability to check. Every mission is arranged as a project — dates come out of that conversation, not before it.

A realistic timeline

~6 mo
Building and qualifying the payload
12 wk
Before launch: flight readiness confirmed
7–10 d
At the launch site with your samples

Typical for an orbital mission. A drop tower or a parabolic flight is far shorter, and a first-time flyer should expect the longer end.

Ready to look at who does what

Answer three short questions and we will show you the companies that fit, grouped by the stage they work in.

Or go straight to every service in the catalogue, compare up to three side by side or see which funding calls are open.